EasyManua.ls Logo

3M Aqua-Pure AP Easy Complete - Cautionary Instructions; Preventing Water Leakage and Damage

3M Aqua-Pure AP Easy Complete
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
CAUTION
CAUTION
To reduce the risk associated with property damage due to water leakage:
Read and follow Use Instructions before installation and use of this system.
Installation and use MUST comply with all state and local plumbing codes.
Protect from freezing, remove lter cartridge when temperatures are expected to drop
below 40° F (4.4° C).
Do not install systems in areas where ambient temperatures may go above 110° F (43.3° C).
Do not install on hot water supply lines. The maximum operating water temperature of
this system is 100°F (37.8°C).
Do not install if water pressure exceeds 120 psi (827 kPa). If your water pressure
exceeds 80 psi (552 kPa), you must install a pressure limiting valve. Contact a plumbing
professional if you are uncertain how to check your water pressure.
Do not install where water hammer conditions may occur. If water hammer conditions
exist you must install a water hammer arrester. Contact a plumbing professional if you are
uncertain how to check for this condition.
Where a back ow prevention device is installed on a water system, a device for controlling
pressure due to thermal expansion must be installed.
Do not use a torch or other high temperature sources near system, cartridges, plastic
ttings or plastic plumbing.
• On plastic ttings, never use pipe sealant or pipe dope. Use PTFE thread tape only, pipe
dope properties may deteriorate plastic.
Take care when using pliers or pipe wrenches to tighten plastic ttings, as damage may
occur if over tightening occurs.
Do not install in direct sunlight or outdoors.
Do not install near water pipes which will be in path of a drilling tool when selecting the
position to mount the bracket.
Mount system in such a position as to prevent it from being struck by other items used in
the area of installation.
Ensure that the location and fasteners will support the weight of the system when installed
and full of water.
Ensure all tubing and ttings are secure and free of leaks.
Do not install unit if collet is missing. Contact 1-866-990-9785 if collets are missing from
any ttings.
SHUT OFF FUEL OR ELECTRIC POWER SUPPLY TO WATER HEATER after water is
shut off.
• The disposable lter cartridge MUST be replaced every six (6) months, at the rated
capacity or sooner if a noticeable reduction in ow rate occurs.
IMPORTANT NOTES
IMPORTANT NOTES
Failure to follow instructions will void warranty.
Allow a minimum of 2" (5 cm) clear space under lter to facilitate cartridge change.
Install with the inlet and outlet ports as labeled. Make sure not to reverse connections.

Other manuals for 3M Aqua-Pure AP Easy Complete

Related product manuals