EasyManua.ls Logo

3M XT-1 - Page 17

3M XT-1
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
3M™ Drive-Thru Systems Model G5 and Model XT-1
Installation Manual
March 2014Revision 2.0
Page 17 of 74
Assembling the Control Pod and Carrier
Follow the procedure below to assemble the Control Pod and Carrier to form a fully functional
headset
On the opposite side of the Headset Carrier, ensure that the Control Pod Locking
Mechanism is in the unlocked position by sliding it all the way to the left. A small flat
head screwdriver or other similar tool can be used to slide the locking mechanism if
needed. See Figure 1 below.
Align Charging Contact Block on Control Pod into the Charging Contact Block
Receptacle of the Headset Carrier. Once the Charging Contact Block is set into in the
Receptacle it will act as hinge or pivot point. See Figure 2
Gently press the two halves together until they securely snap into place at the top. You
may need to apply a slight downward pressure to align the connections appropriately.
When the Control pod is connected to Carrier you will hear a slight click sound. See
Figure 3
Slide locking mechanism on opposite side of carrier to the locked position. See Figure 1.
Insert battery into the now assembled headset. See Figure 4.
LED indicator lights on the Headset should start blinking (refer to component
Identification and Description section below). The headset is now ready for registrations
to a base station.
Figure 1

Table of Contents

Other manuals for 3M XT-1

Related product manuals