Installation 
 
 
3M™ Drive-Thru Systems Model G5 and Model XT-1 
Installation Manual 
March 2014 – Revision 2.0 
Page 17 of 74 
 
 
 
 
 
 
 
 
 
 
Assembling the Control Pod and Carrier 
Follow the procedure below to assemble the Control Pod and Carrier to form a fully functional 
headset 
 
•  On the opposite side of the Headset Carrier, ensure that the Control Pod Locking 
Mechanism is in the unlocked position by sliding it all the way to the left.  A small flat 
head screwdriver or other similar tool can be used to slide the locking mechanism if 
needed.  See Figure 1 below. 
•  Align Charging Contact Block on Control Pod into the Charging Contact Block 
Receptacle of the Headset Carrier.  Once the Charging Contact Block is set into in the 
Receptacle it will act as hinge or pivot point.  See Figure 2 
•  Gently press the two halves together until they securely snap into place at the top.  You 
may need to apply a slight downward pressure to align the connections appropriately.  
When the Control pod is connected to Carrier you will hear a slight click sound. See 
Figure 3 
•  Slide locking mechanism on opposite side of carrier to the locked position.  See Figure 1. 
•  Insert battery into the now assembled headset.  See Figure 4. 
•  LED indicator lights on the Headset should start blinking (refer to component 
Identification and Description section below).  The headset is now ready for registrations 
to a base station.   
 
 
Figure 1