EasyManua.ls Logo

Aastra AXS - 6.3 Operations on a site already installed

Aastra AXS
502 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Maintenance Manual - Aastra 5000 AMT/PTD/PBX/0058/4/6/EN
Installation and activation 01/2011 Page 351
6.3 Operations on a site already installed
There are several types of operations on a completed installation site:
Hardware operations:
• Handling a card
• Adding a CLX card
• Adding an equipment card
• Adding a daughter card to an expansion card or CPU card (EIP)
• Adding an expansion cabinet
• Adding a power module
• Changing to DUPLEX configuration for AXD
Software operations:
• Updating the iPBX software
• Backing up the configuration
• Restoring the configuration associated with the use of VUs
6.3.1 Equipment checklist
If the customer wishes to install equipment from an existing installation, e.g. the customer
may supply a common bell device and an external music source, to determine the overall
size of the new installation, produce a full equipment checklist:
• Existing equipment
• New equipment.

Table of Contents