EasyManua.ls Logo

ABB E6H 63 User Manual

ABB E6H 63
161 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Emax
Installation, service and
maintenance instructions
for low voltage air circuit-breakers
Installation and service
instructions
1SDH000460R0002 L2778

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the ABB E6H 63 and is the answer not in the manual?

ABB E6H 63 Specifications

General IconGeneral
BrandABB
ModelE6H 63
CategoryCircuit breakers
LanguageEnglish

Summary

4. Installation Procedures

Installation Room and Fixed Circuit-Breaker

Guidelines for installation room and fixed circuit-breaker mounting.

Withdrawable Circuit-Breaker Fixed Part Installation

Steps for installing the fixed part of withdrawable circuit-breakers.

5. Electrical Connections

Power Circuit Connections

Guidance on connecting to the power circuit and busbar positioning.

Earthing and Auxiliary Circuits

Instructions for earthing connections and wiring auxiliary circuits.

6. Putting into Service

General Procedures

General steps and checks for putting the circuit-breaker into service.

7. Instructions for Use

Operating and Signalling Parts

Identification and function of operating and signalling parts.

Circuit-Breaker Operation Procedures

Manual and electrical procedures for closing, opening, and racking operations.

8. Maintenance Procedures

Warning and Program

Maintenance warnings and the recommended maintenance program.

Maintenance Operations

Detailed maintenance operations including inspection and contact wear check.

9. Measures for Operating Anomalies

11. Protection Releases - General Notes

Safety Notes

Important safety warnings for handling protection releases.

12. SACE PR121/P Release - Identification

12.2.6 Description of Protection Functions

Detailed descriptions of the PR121/P protection functions.

12.4 Putting into Service

Connections and Checks

Guidance on connections, CS/TC checks, and neutral sensor connection.

12.5 User Interface and Configuration

Parameter Configuration

Steps for changing parameters, modes, and basic configuration.

12.6 Operating Instructions / Operation in Service

Neutral Adjustment

Procedures and specifications for neutral adjustment.

12.7 Alarms, Signals, and Troubleshooting

12.7.2 Troubleshooting and Faults

Guidance on troubleshooting common faults and error messages.

13. SACE PR122/P Release - Identification

13.2.9 Description of Protection Functions

Detailed descriptions of PR122/P protection functions.

13.3 Putting into Service

Connections, Checks, and Tests

Guidance on wiring, sensor checks, and initial testing procedures.

Initial Settings, Password, and Release Replacement

Procedures for initial settings, password management, and release replacement.

14.4 User Interface

Modes and Parameter Configuration

Navigating modes, editing parameters, and performing configuration changes.

14.5 Operating Instructions / Operation in Service

14.6 Alarms and Signals

14.6.3 Table of Error and Warning Messages

List and description of error and warning messages.

14.7 Troubleshooting PR122/P Unit

Troubleshooting Table

Guidance for solving common faults and malfunctions.

16 Appendices

16.6 Residual Current Protection Function

Details on residual current protection, setup, and testing.

Related product manuals