EasyManua.ls Logo

ABB PT003924 - Page 50

ABB PT003924
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / Power2 340-H / Low-pressure stage
6 Operation and service / 6.2 Service work
© Copyright 2022 ABB. All rights reserved. HZTL4053_EN Rev.F March 2022
6.2.3 Service work according to instructions of enginebuilder
u Clean or replace the oil filter located in the supply pipe to the low-pressure and high-pres-
sure stage while the engine is stopped.
6.2.4 Service work every 10000 ... 20000 hours
The rotor and bearing parts must be checked and assessed by a Turbo Systems service sta-
tion.
u Remove low-pressure and high-pressure stage from the engine and dismantle according
to chapter Disassembly and assembly. Measure clearances.
u Clean nozzle ring, turbine casing, and compressor casing, and check for cracks and
erosion/corrosion.
6.2.5 Entries in the engine logbook
The monitoring of the engine enables conclusions to be drawn on the behaviour of the low-
pressure and high-pressure stage.
The following operating data and measured values must be entered regularly in the engine
logbook of the enginebuilder:
¡ Performance and speed of the engine
¡ Air intake temperature
¡ Pressure of the charge air
¡ Pressure loss in the charge air cooler and intercooler
¡ Lubricating oil pressure and lubricating oil temperature
If present:
¡ Speed of low-pressure and high-pressure stage
¡ Air temperature before and after the compressor and after the charge air cooler
¡ Exhaust gas temperature before and after the turbine
¡ Atmospheric humidity of the suction air (before the low-pressure stage)
Page 48 / 122

Table of Contents

Related product manuals