EasyManua.ls Logo

ABB Relion 670 series - Page 114

ABB Relion 670 series
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Secondary system supervision
M12358-1 v10
Table 83. Current circuit supervision CCSSPVC
Function Range or value Accuracy
Operate current (10-200)% of IBase ±10.0% of I
r
at I ≤ I
r
±10.0% of I at I > I
r
Reset ratio, Operate current >90%
Block current (20-500)% of IBase ±5.0% of I
r
at I ≤ I
r
±5.0% of I at I > I
r
Reset ratio, Block current >90% at (50-500)% of
IBase
M16069-1 v12
Table 84. Fuse failure supervision FUFSPVC
Function Range or value Accuracy
Operate voltage, zero sequence (1-100)% of UBase ±0.5% of U
r
Operate current, zero sequence (1–100)% of IBase ±0.5% of I
r
Operate voltage, negative sequence (1-100)% of UBase ±0.5% of U
r
Operate current, negative sequence (1–100)% of IBase ±0.5% of I
r
Operate voltage change level (1-100)% of UBase ±10.0% of U
r
Operate current change level (1–100)% of IBase ±10.0% of I
r
Operate phase voltage (1-100)% of UBase ±0.5% of U
r
Operate phase current (1–100)% of IBase ±0.5% of I
r
Operate phase dead line voltage (1-100)% of UBase ±0.5% of U
r
Operate phase dead line current (1–100)% of IBase ±0.5% of I
r
Operate time, start, 1 ph, at 1 x U
r
to 0 Min. = 10 ms
Max. = 25 ms
-
Reset time, start, 1 ph, at 0 to 1 x U
r
Min. = 15 ms
Max. = 30 ms
-
Line differential protection RED670
1MRK 505 379-BEN N
Version 2.2
114 Hitachi Power Grids
© Copyright 2017 Hitachi Power Grids. All rights reserved

Other manuals for ABB Relion 670 series

Related product manuals