EasyManua.ls Logo

ABB Relion 670 series - Page 118

ABB Relion 670 series
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Scheme communication
M16038-1 v14
Table 90. Scheme communication logic with delta based blocking scheme signal transmit ZCPSCH
Function Range or value Accuracy
Scheme type Off
Intertrip
Permissive UR
Permissive OR
Blocking
DeltaBlocking
-
Operate voltage, Delta U (0–100)% of UBase ±5.0% of ΔU
Operate current, Delta I (0–200)% of IBase ±5.0% of ΔI
Operate zero sequence voltage,
Delta 3U0
(0–100)% of UBase ±10.0% of Δ3U0
Operate zero sequence current,
Delta 3I0
(0–200)% of IBase ±10.0% of Δ3I0
Co-ordination time for blocking
communication scheme
(0.000-60.000) s ±0.2% or ±15 ms whichever is greater
Minimum duration of a carrier
send signal
(0.000-60.000) s ±0.2% or ±45 ms whichever is greater
Security timer for loss of guard
signal detection
(0.000-60.000) s ±0.2% or ±15 ms whichever is greater
Operation mode of unblocking
logic
Off
NoRestart
Restart
-
SEMOD166936-2 v7
Table 91. Phase segregated scheme communication logic for distance protection ZC1PPSCH
Function Range or value Accuracy
Scheme type Intertrip
Permissive UR
Permissive OR
Blocking
-
Co-ordination time for blocking
communication scheme
(0.000-60.000) s ±0.2% or ±15 ms whichever is greater
Minimum duration of a carrier
send signal
(0.000-60.000) s ±0.2% or ±15 ms whichever is greater
Line differential protection RED670
1MRK 505 379-BEN N
Version 2.2
118 Hitachi Power Grids
© Copyright 2017 Hitachi Power Grids. All rights reserved

Other manuals for ABB Relion 670 series

Related product manuals