EasyManua.ls Logo

ABB SACE Emax E4.2 - Page 63

ABB SACE Emax E4.2
77 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABB | SACE Emax 2
Putting into service and maintenance | 4 - First level maintenance61 | © 2019 ABB | 1SDH001000R0002 - ECN000109166 - Rev. D
Disassembly operations
To disassemble the parts of the circuit-breaker:
1. Remove the transparent flange (A) of the trip unit, by turning the screws (B).
2. Remove the front cover of the circuit-breaker (C), by removing the mounting screws (D).
A
D
B
C
2
1
90°
1
2
Figure 77 - Removing the flange and front cover
3. Remove the gearmotor (E) by removing the screw (F) and the connector.
E
E
F
Figure 78 - Removing the gearmotor
4. If there is an undervoltage coil (G), remove it, and discharge the springs of the operating mechanism
for closing and opening the circuit breaker.
G
3
1
E
F
4
2
Figure 79 - Removing the undervoltage coil

Other manuals for ABB SACE Emax E4.2

Related product manuals