SACE Tmax XT
Doc. N.° 1SDH002013A1620 - ECN000190766 - Rev. C
Tools
Outils
Werkzeug
Herramienta
Utensile
Ferramentas
Gereedschap
Narzędzia
XT7
1 1
1
8
4 2
2
Flange Handle Breaker Mechanism Kit XT7
Flange Handle Meccanismo Interruttore XT7
Kabelbetätigungsmechanismus XT7
Mécanisme de câble opérateur XT7
Mecanismo de operador de cable XT7
电缆操纵器机构 XT7
Flange Handle Breaker Mechanism XT7
2
4
4
M4x10
M4 M5 M5 M8 M8
2 2
Cable XT7
1
2
1
5/8
5/8-18 1/4-28
1/4

Other manuals for ABB SACE Tmax XT

Question and Answer IconNeed help?

Do you have a question about the ABB SACE Tmax XT and is the answer not in the manual?

ABB SACE Tmax XT Specifications

General IconGeneral
BrandABB
ModelSACE Tmax XT
CategoryCircuit breakers
LanguageEnglish

Summary

Flange Handle Breaker Mechanism Assembly

Initial Mechanism Assembly Steps

Illustrates initial steps for assembling the breaker mechanism, including applying grease and tightening screws.

Mechanism Component Attachment

Details attaching components to the breaker mechanism with specific torque values for fasteners.

Grease Application and Torque Settings

Shows grease application on mounting brackets and specifies torque for securing components.

Final Mechanism Integration

Depicts the final assembly stages of the flange handle mechanism onto the breaker unit.

Cable Connection and Preparation

Cable Short End Preparation

Instructions for preparing the short end of the cable, referencing parts from the Cable XT7 Kit.

Cable Long End Preparation

Instructions for preparing the long end of the cable, referencing parts from the Breaker Mechanism Kit.

Integrating Cable Mechanism with Breaker

Connecting Cable to Mechanism

Illustrates the process of connecting the prepared cable ends to the breaker mechanism assembly.

Critical Gap Adjustment for Cable Insertion

Ensures proper gap between edge guard and handle before inserting cable into yoke assembly.

Securing Cable Mechanism with Torque

Details the final tightening of the cable mechanism to the breaker with specified torque values.

Operation Testing and Final Checks

Breaker Trip Status Indicator

Shows the 'TRIP' status indicator on the breaker and its relationship to the mechanism.

Mechanism Operation Verification

Illustrates how to check the correct operation of the installed mechanism using indicators.

Fastening Procedure with Torque

Details a specific fastening step with torque requirements for the assembled mechanism.

Final Operation Check

Confirms the correct functioning of the breaker mechanism after installation.