42/23-55 EN Rev. 1 SCC-C Sample Gas Cooler Operator’s Manual 23
Sample Gas Cooler Packing
Step Action
Activate Compressor’s
Transportation
Restraints
1 Using a Ph2 cross-head screwdriver, turn the two screws counter-
clockwise through the holes in the base plate to the point at which the
compressor housing is in contact with the base plate (noticeable
resistance).
Step Action
1 If the original packaging is not available, cover the sample gas cooler
with bubble paper or corrugated cardboard.
Place the sample gas cooler in an adequately sized box lined with
shock-absorbing material (e.g. foam).
2
The cushioning material’s thickness should be adequate for the
sample gas cooler’s weight and the mode of shipping.
3 Mark the box “Fragile Item” and “Transport Upright”.
Additional steps when shipping overseas:
Add a drying agent (e.g. silica gel) and wrap the sample gas cooler
air-tight in an additional 0.2-mm thick polyethylene sheet.
4
The amount of drying agent used should be adequate for the
package volume and the planned shipping time (at least
3 months).
Packing
5 The box should also be lined with a double layer of bitumen paper.
Ambient Temperature Ambient temperature for storage and transportation: –25 to +60 °C