Figure 3. Placing the pole mount on the pole
2. Slide the pole mount onto the pole unl the top of the pole2.
mount clamp is below the boom edge of the black pole cap.
NOTE: The top of the pole mount clamp should be at least
1.2 cm below the top of the pole. When installed, ensure the
top of the generator is no higher than 139.7 cm (55 in) from the
oor.
Figure 4. Tightening the cap-head screws
1.
Top of pole mount clamp
placed at least 1.2 cm
(0.5 in) below the boom
edge of the black pole cap
3.
Using the screwdriver included in the kit, ghten the cap-head
3.
screws, alternang between the two, unl the pole mount
clamp base is rmly aached to the clamp cap.
5