2Product Installation
2.1 Preparation Before Installation
Conventional panels cannot be installed on the seashore, and panels with special
anti-salt-alkali materials can be installed on the seashore
The humidity at the installation site must not exceed 85RH;
The installation site temperature should be -20 ~ 50 , and the panels with
special low temperature materials can be installed at -30 ~ 20 .
2.2 Cabinets Splicing
2.2.1 Splicing horizontally
2.2.2 Splicing vertically

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Absen LR3.9-7.8 and is the answer not in the manual?

Absen LR3.9-7.8 Specifications

General IconGeneral
BrandAbsen
ModelLR3.9-7.8
CategoryProjection Screen
LanguageEnglish

Related product manuals