EasyManua.ls Logo

AEG VB 40.5 - Installation, Commissioning and Operation

AEG VB 40.5
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Fixed type (terminal)
7. Installation, commissioning and operation
7-1 When the circuit breaker is lifted from the packing box, the hook shall be hung on the lifting
position with lifting mark on the circuit breaker. When moving, the upper and lower outlet arms shall not
be stressed, and the circuit breaker shall not be subject to large impact and vibration.
7-2 In case of problems in operation, determine the causes according to the table below. If it can't be
solved, please contact the manufacturer. Do not disassemble the circuit breaker by yourself.

Related product manuals