EasyManuals Logo

Afore AF3K-SL User Manual

Default Icon
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
Please check the following requirements before testing:
• Installation location is suitable according to Chapter 4.1.3.
All electrical wires are connected tightly, including PV modules, battery and
AC side(Such as the grid side, EPS side, Gen side).
• Earth line and Smart meter/CT line are connected.
AF-DF hybrid inverters should be set according to the required local grid
standard.
• More information please contact with Afore or distributors.
6. Power ON/OFF
Power ON/OFF
35
Diese1Gen GenEn ON
TimeCtr1Em ON
TimeDelay 0S
StarSoc 20.0%
EndSoc 80.0%
TimOn1 00:00
TimOff1 00:00
TimOn2 00:00
TimOff2 00:00
TimOn3 00:00
TimOff3 00:00
Note:
Diesel generator enable and time control enabled must be on,
other wise the diesel generator can not be started.
1. Diese1Gen GenEn — Diesel generator enable.
2. TimeCtr1Em — Time control enable.
3. TimeDelay — Delay time of diesel generator
start working.
4. StarSoc — Battery power percentage when
diesel generator start charging the battery.
5. EndSoc — Battery power percentage when
diesel generator stop charging the battery.
6. TimOn1 — Diesel generator start time 1.
7. TimOff1 — Diesel generator off time 2.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Afore AF3K-SL and is the answer not in the manual?

Afore AF3K-SL Specifications

General IconGeneral
BrandAfore
ModelAF3K-SL
CategoryInverter
LanguageEnglish

Related product manuals