14
Battery Management Functionality
E7495A/B Manual Verification
3. Battery Charge Statistics
Setup
• Reconnect the Ext DC power to the E7495A/B.
• Insure a charged battery is installed in the E7495A/B in 
Battery Position #2.
Test Results
• Access the Battery Statistics Screen
— Press the [System] Key
— Press the [More 1 of 2] Softkey
— Press the [System Stats] Softkey
— Press the [Battery] Softkey
• Verify the following fields on the Battery Status Screen with a 
Battery in Battery Position #2 only.
Battery Status
• Battery 1 field = Missing
• Battery 2 field = Present
Run Time to Empty
• Battery 1 field = ----
• Battery 2 field = External DC Power