Commissioning Procedure ± Example
CONDENSERS/CONDENSING
UNITS - C/CUS/CUHS/HCU/CFCUS
Ai red a l e I n t e r n a ti o nal
Ai r Co n d i t i o n i n g L t d
TO BE COMPLETED IN CONJUNCTION WITH COMMISSIONING PROCEDURE
RETURN WHITE COPY TO AIREDALE/RETAIN PINK COPY
Leeds Road, Rawdon, Leeds
LS19 6JY ENGLAND
Tel: 0113 239 1000
Fax: 0113 250 7219
Model: Serial No: Site Ref:
1 Pre Commissioning Checklist
1.1 Unit Condition Satisfactory
1.2 Holding charge retained
1.3 Electrical connections tight
1.4 Voltage at mains supply
1.5 System pressure test:
2 Commissioning Checklist
2.5 Timer settings correct and operational (if fitted)
Low pressure override - 3mins
Anti cycle timer -10 mins
2.6 Head pressure control set
2.7 HP/LP switch cut outs:
iii HP cut out - 27.0 barg
2.8 HGBP valve setting (if fitted)
2.9 Superheat at compressor
2.10 Added oil volume (if applicable)
2.11 Operating conditions:
2.12 Compressor Amps (CU & CFCU)