First start up work shall be carried out exclusively by fully trained, professionally
qualified personnel.
Before first start up check that;
START UP
x There is a copy of the boiler and burner instructions in the boiler room.
x The boiler name plate and manual specifications and power supply network
and other system need specifications correspond. (electric supply, fuel, water,
boiler and burner output, system pressure, circulating pipes …)
x The air inlet and outlet supply openings are correctly sized and free from
obstacles.
x The flue gas exhaust system is correctly fitted and sized.
x All the system control and security devices are present and installed according
to the current regulations and working properly.
x The burner output and fuel type is compatible with the boiler and system
specifications.
x The flue gas turbulators are present in all the second pass pipes and properly
placed.
x Control the boiler gas side seals are not damaged and fixed properly (boiler
front door, burner mounting plates, smoke box, flame monitoring glass).