31
System water never fully drained if it is not necessary. Corrosion is very rapid in
empty systems. New water filling means adding new scale and oxygen to the
system. Both reasons cause to shorten the boiler service life and cause loss of
efficiency.
System water level must be checked minimum once a month. At the fist installation
it needs regular check because of air discharge from the system.
Burner must be regularly serviced, check burner instruction manuals for special
needs and periods.
Installation period temperature sensing bulb fitting is filled with fluid oil please
check once a year and if the level is low add any kind of fluid oil. Oil will help the
response time of sensing the temperature.
Chimney must be cleaned periodically according to the national regulations.
If the system will be shut off for long periods in winter time please take
precautionary actions for freezing the system water.
Fuel and water filters shall be cleaned regularly according the system need.
Boiler Control Panels
Standart Panel (PS)
1. Control Panel Fuse (6 A)
2. Safety Limit Thermostat (100°C)
3. Boiler Temperature Gauge (10-120°C)
4. Main Power Switch
5. Main Power Indicator Lamp
6. Limit Thermostat Failure Indicator
7. First and Second Stage Thermostat
12 3
574
6
konforal
Eco Panel (PE 7/21 or PE 12/31)
1. Control Panel Fuse (6 A)
2. Safety Limit Thermostat (100°C)
3. Boiler Temperature Gauge (10-120°C)
4. Main Power Switch (O/I )
5. Main Power Indicator Lamp
6. Limit Thermostat Failure Indicator Lamp
7. Eco Panel (Microprocessor) (PE 7/21 or PE 12/31)
8. First and Second Stage Thermostat (30-85°C/7K)
12 3
584
6
konforal
7
Boiler Optional Control Panels