19
190313-24 AL6B
Firebrick Installation Instructions
This package contains 19 full-size rebricks, as well as 5 various cut bricks.
With the woodstove in the upright position, install rebricks as follows:
1. Place the rebricks on the bottom of the unit rst. Use a total of 6 full-size (D)
and 5 cut bricks (A, B, C & 2E) with ash cleanout system.
2. Next install the side rebricks, 3 full-size and 2 cut rebricks(F) on each side
of the rebox as shown.
3. Finally install 4 full-size bricks against the rear wall as shown.
ITEM SIZE
A 1 1/2” X 4 1/2” X 1 1/4”
B 4” X 4 1/2” X 1 1/4”
C 7 1/4” X 4 1/2” X 1 1/4”
D 9” X 4 1/2” X 1 1/4”
E 9” X 4 1/2” X ANGLED CUT
F 9” X 3 1/2” X 1 1/4”
B
F
E
C
A
D
F