EasyManuals Logo

Allied Telesis AT-9924T Installation And Safety Guide

Allied Telesis AT-9924T
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
x900 Series Switch and SwitchBlade
®
x908
14
8. Ensure that the circuit breaker is off for the supply circuit and the Run/
Standby switch on the PSU. Release the Run/Standby switch so that it is not
pushed in (which is the Off position).
9. Connect the supply cable wires to the circuit breaker.
10. Turn on the PSU by pushing in the Run/Standby switch.
11. Confirm that the switch is receiving power.
Check that at least one of the PSU LEDs on the front panel of the switch is
lit green. If no LEDs light, refer to the Hardware Reference for
troubleshooting information.

Other manuals for Allied Telesis AT-9924T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis AT-9924T and is the answer not in the manual?

Allied Telesis AT-9924T Specifications

General IconGeneral
BrandAllied Telesis
ModelAT-9924T
CategorySwitch
LanguageEnglish

Related product manuals