EasyManua.ls Logo

Alpine LC70-69P - Tweeter Panel Assembly; Install and Lock Tweeter into Panel; Voltage Regulator Assembly; Mount Voltage Regulator

Alpine LC70-69P
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49 50
Assembly: Tweeter Panel
With the Tweeter loose from the retail mounting assembly. Feed the wires through the
hole of the provided Tweeter Panel. Snap the Tweeter into place by seating the bottom
edge rst and levering the top edge down.
77
Now that the tweeter is place. Lock it in with the provided chrome ring. The ring has 3
locking clips. Locate them into the panels holes and rmly push it into place. It should
sit ush with the top face of the Tweeter panel. If it does not dissasemble and reseat
the Speaker and try again.
78
PASSENGER SIDE DRIVERS SIDE
Assembly: Voltage Regulator
Mount the provided Voltage regulator to the regulator bracket using the provided
machine screws.
79
80
You can now mount the voltage regulator in the 3” Factory speaker location. Note the
regulator can also be mounted in passanager side location.

Related product manuals