EasyManua.ls Logo

Alto-Shaam Vector VMC-H4H

Alto-Shaam Vector VMC-H4H
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Vecto r H® S eries Operat ors M anual M N-46 2 95 Rev 7 6/22
47
Continued from previous page
2. Level the unit as necessary. To do so, screw the wheel up or down until the
unit is level. Tighten the jam nut
c.
Slide a piece of the tubing d over the exposed screws if more than
1/4-inch of thread is exposed.
Attach wire tie e around the tubing to hold it in place.
Install the tether 3. Install the tether to the lower oven. Install the tether so that no stress is
transmitted to the electrical cord when the oven moves.
Result The casters are now installed.
VMC-TS-008009
c
d
e
VMC-TS-006893

Table of Contents

Other manuals for Alto-Shaam Vector VMC-H4H

Related product manuals