Do you have a question about the American Standard S9V2B080U4VSAB and is the answer not in the manual?
Covers fire, explosion, electrical, and carbon monoxide hazards during installation and operation.
Essential safety measures, codes, and required clearances for furnace placement.
Steps for initial furnace start-up, including preliminary inspections and safety checks.
Overview of the IFC menu for configuration, status, and fault recovery.
Covers fire, explosion, electrical, and carbon monoxide hazards during installation and operation.
Essential safety measures, codes, and required clearances for furnace placement.
Steps for initial furnace start-up, including preliminary inspections and safety checks.
Overview of the IFC menu for configuration, status, and fault recovery.
| Model | S9V2B080U4VSAB |
|---|---|
| Blower Motor | Variable Speed |
| Heating Capacity | 80, 000 BTU/h |
| Stages | Two-Stage |
| Fuel Type | Natural Gas |