EasyManua.ls Logo

American Standard YCZ036F1 User Manual

American Standard YCZ036F1
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
All phases of this installation must comply with the NATIONAL, STATE & LOCAL CODES. In the absence of local codes, the
installation must conform with National Electric Code -- ANSI/NFPA 70 or "LATEST REVISION."
Since the manufacturer has a policy of continuous
product improvement, it reserves the right to change
specifications and design without notice.
© American Standard Inc. 1999
HAZARDOUS VOLTAGE - DISCONNECT POWER BEFORE SERVICING
WARNING:
INSTALLATION
OPERATION
MAINTENANCE
ALL phases of this installation must comply with
NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit. Please return to service information pack upon completion of work.
Single Package Two Stage
Gas/Electric 16 SEER
Convertible 3 & 5 Ton
Model:
YCZ036F1/3M0B
YCZ060F1/3M0B
BAYLIFT002A
LIFTING LUG KIT
18-EB21D4-2
Library
Product Section
Product
Model
Literature Type
Sequence
Date
File No.
Supercedes
Service Literature
Unitary
Packaged Gas/Electric
YCZ
Installation, Operation, Maintenance
1A
July 1999
SV-UN-RT-YCZ-IOM-1A 7/99
YCZ-IOM-1
YCZ-IOM-1A
Question and Answer IconNeed help?

Do you have a question about the American Standard YCZ036F1 and is the answer not in the manual?

American Standard YCZ036F1 Specifications

General IconGeneral
Model NumberYCZ036F1
BrandAmerican Standard
CategoryFurnace
Ignition TypeHot Surface Ignition
BTU Input36, 000 BTU
Fuel TypeNatural gas

Summary

Single Package Two Stage Gas/Electric 16 SEER Convertible 3 & 5 Ton

Safety Warnings and Code Compliance

Highlights critical safety warnings and national/local code compliance for installation.

General Information and Unit Inspection

Safety Warnings and Hazard Information

Addresses high voltage, gas, and grounding hazards, plus California Proposition 65 warnings.

Unit Support and Rigging

Unit Placing and Rigging Safety

Details procedures and safety precautions for lifting and placing the unit using lifting lugs.

Gas Piping Installation Procedures

Gas Supply Line Pressure Requirements

Covers gas supply pressure, regulator installation, and pressure settings for the unit.

Gas Piping Schedule and Connections

Provides a schedule for pipe sizing based on CFH and outlines connection steps.

Performance Adjustment and High Altitude

Gas Input Check and Manifold Pressure Adjustment

Details how to check gas input and adjust manifold pressure for optimal performance.

Filter and Electrical Wiring

Electrical Connections and Power Wiring

Covers electrical wiring, grounding, disconnect switches, and power supply requirements.

Electrical Wiring Diagrams

Field Wiring Diagram for YCZ-F Unit

Presents the field wiring diagram for the YCZ-F packaged gas-electric unit.

Unit Start-Up Procedures

Pre-Start Quick Checklist

A comprehensive checklist of pre-start checks for proper unit installation and readiness.

Heating Cycle Start-Up

Step-by-step procedure for starting the unit's gas heating cycle.

Operational Sequences and Adjustments

Gas Heating Mode Start-Up

Detailed steps for starting the unit in gas heating mode, including safety checks.

Manifold Pressure Check and Adjustment

Guides on checking and adjusting manifold pressure for correct furnace operation.

Troubleshooting and Diagnostics

Ignition LED Diagnostic Indicator Codes

Lists LED flash codes and their corresponding system fault indications.

System Fault Troubleshooting Chart

Provides a chart to diagnose system faults by identifying primary and secondary causes.

Routine and Serviced Maintenance

Serviced Maintenance Checks

Lists checks for serviceman during cooling and heating seasons, including flue cleaning.

Related product manuals