EasyManua.ls Logo

American Standard YCZ063M0B User Manual

American Standard YCZ063M0B
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
All phases of this installation must comply with the NATIONAL, STATE & LOCAL CODES. In the absence of local codes, the
installation must conform with National Electric Code -- ANSI/NFPA 70 or "LATEST REVISION."
Since the manufacturer has a policy of continuous
product improvement, it reserves the right to change
specifications and design without notice.
© American Standard Inc. 1999
HAZARDOUS VOLTAGE - DISCONNECT POWER BEFORE SERVICING
WARNING:
INSTALLATION
OPERATION
MAINTENANCE
ALL phases of this installation must comply with
NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit. Please return to service information pack upon completion of work.
Single Package Two Stage
Gas/Electric 16 SEER
Convertible 3 & 5 Ton
Model:
YCZ036F1/3M0B
YCZ060F1/3M0B
BAYLIFT002A
LIFTING LUG KIT
18-EB21D4-2
Library
Product Section
Product
Model
Literature Type
Sequence
Date
File No.
Supercedes
Service Literature
Unitary
Packaged Gas/Electric
YCZ
Installation, Operation, Maintenance
1A
July 1999
SV-UN-RT-YCZ-IOM-1A 7/99
YCZ-IOM-1
YCZ-IOM-1A
Question and Answer IconNeed help?

Do you have a question about the American Standard YCZ063M0B and is the answer not in the manual?

American Standard YCZ063M0B Specifications

General IconGeneral
Model NumberYCZ063M0B
BrandAmerican Standard
CategoryFurnace
AFUE80%
BTU Input63, 000
StagesSingle Stage
IgnitionHot Surface Ignition
Fuel TypeNatural Gas
Furnace TypeUpflow/Horizontal

Summary

General Information

Inspection

Check the unit for damage, correct application, and refrigerant charge after unloading.

Precautionary Measures

Take steps to avoid breathing fiberglass dust and contact with skin or eyes.

First Aid Measures

Provide first aid for eye contact and skin contact with hazardous substances.

Typical Rooftop Installation With Full Perimeter Curbs

Typical Rooftop Installation With Baycurb030a,038a

Dimensional Data

Ycz036,060f Outline – Back

Provides a back view outline with dimensions and a table of corner and unit weights.

Recommended Service Clearance

Clearance to Combustible Material

Converting Horizontal to Downflow

Required Clearance for Unit Installation and Roof Penetration Hole Size Required

Locations and Recommendations

Horizontal Airflow Application

Guidelines for installing the unit for horizontal airflow, including clearance and placement.

Downflow Application -- Curb Mounting

Instructions for mounting the unit on a roof curb for downflow applications.

Clearances

Locations and Recommendations

Unit Support

Covers requirements for roof-mounted unit support and electrical power considerations.

Location and Clearances

Details installation location requirements and clearances according to codes and figures.

Installation

Placing and Rigging

Instructions on safely lifting and positioning the unit using appropriate rigging methods.

Installation

Placing the Unit on a Mounting Curb

Detailed steps for placing and securing the unit onto a roof mounting curb.

Installation

Rooftop -- Units

Procedure for rooftop applications using a field fabricated frame and ducts.

Installation

Ground Level -- Horizontal Units

Instructions for installing the unit on a pad for ground-level horizontal applications.

Condensate Drain Piping

Ductwork

Attaching Downflow Ductwork to Roof Curb

Guidelines for attaching downflow ductwork to the roof curb.

Attaching Horizontal Ductwork to Unit

Instructions for attaching horizontal ductwork to the unit, including flexible connections.

Gas Piping Installation

Pipe Delivery Schedule

Procedure and tables for calculating gas pipe size and delivery for natural gas.

Gas Supply Line Pressure

Guidelines for checking and setting gas supply line pressure, including regulator use.

Gas Pressure Set-Up Precautions

Gas Piping Installation

Manifold Pressure

How to check and adjust the manifold pressure at the unit gas valve.

Burner & Valve Illustration

Flue and Hood Illustration

Input Check and Adjustment

High Altitude Installation

Guidelines for adjusting orifices for installations at high altitudes.

Filter Installation

Electrical Wiring

Electrical Power and Connections

Covers power supply, disconnect, overcurrent protection, grounding, and wiring requirements.

Control Wiring (Class II)

Instructions for low voltage control wiring, thermostat connections, and wire resistance limits.

Electrical Wiring

Ycz-f Field Wiring Diagram

Detailed field wiring diagram for the packaged gas-electric unit, including connections.

Start - Up

Pre-Start Quick Checklist

A checklist of essential checks before starting the unit.

Operating Modes and Checks

Procedures for operating modes (cooling, heating), voltage checks, and shutdown.

Start - Up

Starting the Unit in the Gas Heating Mode

Detailed steps for starting the unit in gas heating mode, including purging and safety checks.

Manifold Pressure

How to check and adjust manifold pressure during furnace operation.

Sequence of Operation

Sequence of Operation

Cooling Cycle

Explains the operation sequence for thermostat calls in cooling mode.

Icm Fan Motor Adjustments

Information on adjusting the indoor blower fan motor speed using dip switches.

Indoor Blower Timing

Details on setting the fan-off delay using dip switches on the ICMC control.

Ign Led Diagnostic Indicator

Checkout Procedure

Troubleshooting Chart

A chart listing system faults and their primary/secondary causes for diagnosis.

Maintenance

Routine Maintenance by Owner

Tasks the owner can perform, like filter replacement and cabinet cleaning.

Condenser Coil Cleaning

Instructions for cleaning the condenser coil.

Serviceman Maintenance Checks (Cooling & Heating)

Recommended seasonal checks by a qualified serviceman for optimal operation.

Flue Cleaning

Limited Warranty

Related product manuals