EasyManua.ls Logo

amzchef YL-CF6601HS - Installation Guide; Work Surface Preparation; Ventilation and Spacing

amzchef YL-CF6601HS
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
The device meets the requirements of Regulation 2014/35/EU as well as the
applicable standardsEN 60335-1:2012 + A11:2014 + AC:2014 + A13:2017 ;
EN60335-2-6:2015; EN 62233:2008
Manufacturer:Zhongshan Youlong Kitchen Appliances Co., Ltd
Add.: No. 103, SanXin Road, Sanjiao Town, Zhongshan, Guangdong, China
Installation
Selection of installation equipment
Cut out the work surface according to the sizes shown in the drawing.
For the purpose of installation and use, a minimum of 5 cm space shall be preserved
around the hole.
Be sure the thickness of the work surface is at least 30mm. Please select heat-resistant
work surface material to avoid larger deformation caused by
the heat radiation from the hotplate. As shown below:
L(mm)
W(mm)
H(mm)
D(mm)
A(mm)
B(mm)
X(mm)
590
520
52
48
560
490
50mini
Under any circumstances, make sure the ceramic cooker hob is well ventilated and the air
inlet and outlet are not blocked. Ensure the ceramic cooker hob is in good work state. As
shown below
Note: The safety distance between the hotplate and the cupboard above the
hotplate should be at least 760mm.

Related product manuals