EasyManua.ls Logo

Ankom TDF - Page 85

Ankom TDF
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operator’s Manual
Rev 9/20/18 pg. 85
6. Install extra plastic containers under all six IDF Delivery Nozzles to catch any fluid currently in the lines.
With containers in place, press the OK button. After fluid empties into the containers, the following screen will be
displayed.
7. Remove the containers with fluid.
8. Install the empty pre-weighed beakers under all six IDF Delivery Nozzles and press the OK button.
While the fluids are being delivered, the following screen will be displayed.
Place Calibration containers under
the IDF Delivery Nozzles.
Press OK when done.
OK
Volume Calibration