ANSUL
WATEROSCILLATINGMONITORS
INSTALLATION –  OPERATION  –  MAINTENANCE
MANUAL
Part No. 77435-02
Question and Answer IconNeed help?

Do you have a question about the Ansul WOM-3 and is the answer not in the manual?

Ansul WOM-3 Specifications

General IconGeneral
BrandAnsul
ModelWOM-3
CategoryMeasuring Instruments
LanguageEnglish

Summary

Mounting Requirements

Safety Warning: Monitor Rotation Hazards

Warning about potential injury from monitor rotation and entrapment.

Mounting Clearance Requirements

Determining required clearance for monitor mounting based on oscillation and elevation.

Supply Pipe Flushing Procedure

Flushing the supply pipe before connecting the monitor to remove debris.

Maximum Inlet Pressure Notice

Specifies the maximum allowable inlet pressure for the monitor.

Monitor Inlet Flange and Connection Details

Describes the monitor inlet flange, required mating flange, and securement bolts.

Support Stand Requirements

Information on ANSUL Support Stand or other support for monitor operating force.

Monitor Testing Procedures

Safety Caution: Moving Parts

Caution regarding severe personal injury from moving parts in the oscillating mechanism.

Connect Garden Hose for Testing

Connecting a garden hose to the back of the oscillating mechanism enclosure.

Set Selector Valve to Test;Manual

Setting the selector valve handle to the TEST/MANUAL position.

Turn On Water Supply

Supplying water to the garden hose for testing procedures.

Verify Oscillation Limits and Adjustments

Checking oscillation within limits and referencing adjustment pages.

Turn Off Water Supply

Stopping the water supply to the garden hose after testing.

Return Selector Valve to Run Position

Returning the selector valve handle to the RUN position and securing it.

Manually Rotate Monitor to Position

Manually rotating the monitor to click into position.

Apply Silicone Grease to Valve Ports

Applying silicone grease into open ports on the underside of the oscillating valve.

Manually Rotate Monitor to Opposite Side

Manually rotating the monitor to the opposite side until it clicks.

Apply Silicone Grease Again

Applying silicone grease again to each open port.

Return Monitor to Original Position

Manually rotating the monitor back to its initial position.

Pull Release Pin to Disengage Monitor

Pulling the release pin to disengage the monitor from the oscillating mechanism.

Check Monitor Free Movement

Rotating the monitor 360 degrees to check for free movement.

Elevation Maintenance Notice

Notice to mark or measure elevation to maintain it after testing.

WOM-3 Elevation Adjustment and Seal

Adjusting WOM-3 elevation, tightening handle, and replacing seal.

WOM-4 Elevation Adjustment and Seal

Adjusting WOM-4 elevation, tightening handwheel, and replacing seal.

Engage Monitor Base with Release Pin

Realigning holes and inserting release pin to engage monitor base.

Monitor Operation

Safety Warning: Discharge Stream Hazard

Warning about severe personal injury from discharge stream and personnel in path.

Safety Caution: Mechanism Moving Parts

Caution regarding severe personal injury from moving parts in the oscillating mechanism.

Automatic Oscillation Mode Operation

Operating the monitor in automatic oscillation mode by turning on the main water supply.

Adjusting Stream Elevation

Adjusting stream elevation for WOM-3 (tiller bar) and WOM-4 (handwheel).

Manual Operation Setup

Setting up manual operation by turning the selector valve to TEST/MANUAL.

Disengage Monitor for Manual Operation

Pulling the release pin to disengage the monitor from the oscillating mechanism.

Rotate Monitor with Tiller Bar

Using the tiller bar to manually rotate the monitor.

Manual Elevation Adjustment

Adjusting manual stream elevation for WOM-3 and WOM-4 monitors.

After Use Procedures

Returning Monitor to Standby Position

Steps to return the monitor to its standby position after operation.

Turn Off Main Water Supply

Procedure to turn off the main water supply after use.

Manual Operation Post-Use Steps

Steps for manual operation: realign pin, return selector valve to RUN.

Return Monitor to Desired Elevation

Returning the monitor to its desired elevation and securing handles.

Clean Filter Element

Cleaning the filter element as per instructions on Page 9.

Replace Visual Inspection Seals

Replacing any broken or missing visual inspection seals on controls.

Maintenance Procedures

Importance of Regular Maintenance

Ensuring monitor life and operation through regular maintenance every six months.

Perform Monitor Testing

Conducting monitor testing procedures as detailed on Page 6.

Clean Filter Element

Steps to clean the filter element by removing, cleaning, and reinstalling it.

Check Flange Bolts and Supports

Ensuring flange bolts are tight and monitor supports are secure.

Lubricate Grease Fittings

Lubricating grease fittings by rotating the monitor to align access holes.

Lubricate Couplings

Lubricating monitor base and elevation couplings with monolithium grease.

Remove Mechanism Cover

Removing the cover from the oscillating mechanism enclosure.

Tighten Drive Chain

Steps to tighten the drive chain by adjusting clevis assembly washers.

Lubricate Chain and Sprockets

Lubricating the drive chain and sprockets with monolithium grease.

Reinstall Mechanism Cover

Reinstalling the cover onto the oscillating mechanism enclosure.

Record Maintenance Date

Recording the date of maintenance examination as per authority requirements.

Oscillation Speed Control Adjustment

Speed Adjustment Overview

Overview of adjusting oscillation speed using test or operating conditions.

Safety Warning: Discharge Stream Hazard

Warning about severe personal injury from discharge stream and personnel in path.

Safety Caution: Mechanism Moving Parts

Caution regarding severe personal injury from moving parts in the oscillating mechanism.

Speed Adjustment Using Test Mode

Adjusting oscillation speed using test mode, ensuring correct hose pressure.

Verify Hose Pressure with Gauge

Installing a pressure gauge to verify hose pressure for speed adjustment.

Access Speed Adjustment Hole

Removing plug from speed adjustment access hole on enclosure side.

Connect Garden Hose for Speed Test

Connecting garden hose to oscillating mechanism enclosure for speed adjustment.

Set Selector Valve to Test;Manual

Setting selector valve handle to TEST/MANUAL position for speed adjustment.

Turn On Water Supply for Speed Test

Turning on water supply to garden hose for speed adjustment.

Adjust Speed Control Screw

Adjusting speed by turning control screw clockwise (decrease) or counterclockwise (increase).

Turn Off Water Supply

Turning off water supply to garden hose after speed adjustment.

Return Selector Valve to Run

Returning selector valve to RUN position and securing with seal.

Remove Test Equipment

Removing pressure gauge, coupling, nipple and reinstalling pipe plug.

Speed Adjustment Under Operating Condition

Adjusting speed during normal operation by turning the control screw.

Oscillation Arc Adjustment

Setting Oscillation Arc

Steps to set the monitor's arc of oscillation, referencing limits and locations.

Remove Mechanism Cover

Removing the cover from the oscillating mechanism enclosure.

Loosen Front Adjustment Nuts

Loosening front adjustment nuts and spinning them to the front end of the rod.

Loosen Rear Adjustment Nuts

Loosening rear adjustment nuts and spinning them to the rear end of the rod.

Manually Rotate to Right Stop

Manually rotating the monitor to its right stop position.

Manually Rotate to Left Stop

Manually rotating the monitor to its left stop position until valve clicks.

Position Brass Tube

Manually rotating monitor until brass tube is 6 3/4 inches from chassis rear.

Center Monitor Arc of Oscillation

Centering the monitor arc, with steps for adjustment if needed.

Rotate to Right Arc Position

Manually rotating the monitor to the right position of the desired oscillation arc.

Slide End-Stop Tube B

Sliding end-stop tube B into the front of the brass cylinder.

Adjust Front Nuts to End-Stop Tube B

Spinning front adjustment nuts until they contact end-stop tube B.

Rotate Left to Center Arc

Manually rotating the monitor left to the approximate center of the desired arc.

Lock Front Adjustment Nuts

Spinning front nuts further and locking them to secure the arc.

Rotate to Right Stop Again

Manually rotating the monitor to the right stop until the valve clicks.

Rotate Left to Desired Arc

Manually rotating the monitor left to the desired arc of oscillation position.

Slide End-Stop Tube A

Sliding end-stop tube A into the back of the brass cylinder.

Adjust Rear Nuts to End-Stop Tube A

Spinning rear adjustment nuts until they contact end-stop tube A.

Rotate Right to Center Arc

Manually rotating the monitor right to the approximate center of the desired arc.

Lock Rear Adjustment Nuts

Spinning rear nuts further and locking them to secure the arc.

Reinstall Mechanism Cover

Reinstalling the cover onto the oscillating mechanism enclosure.

Test Monitor Oscillation

Testing monitor oscillation by referring to Monitor Testing section.

Winterizing Procedure

Protecting Monitor from Freezing

Steps to protect the monitor from freezing in low temperatures.

Manually Rotate to Right Stop

Manually rotating the monitor to its right stop position.

Manually Rotate to Left Stop

Manually rotating the monitor to its left stop position until valve clicks.

Connect Garden Hose for Winterizing

Connecting a garden hose to the oscillating mechanism enclosure.

Immerse Hose in Antifreeze Solution

Immersing the hose end into a 50% ethylene glycol and 50% water solution.

Set Selector Valve to Test;Manual

Setting the selector valve handle to the TEST/MANUAL position.

Cycle Monitor to Discharge Glycol

Cycling the monitor to discharge ethylene glycol solution from the four-way valve.

Testing Glycol Solution Strength

Testing the strength of the ethylene glycol solution with a hydrometer.

Manually Rotate to Center Arc

Manually rotating the monitor to the center of its oscillation arc.

Return Selector Valve to Run

Returning the selector valve handle to RUN position and securing it.

Force Glycol into Bypass Tube

Manually rotating the monitor to force ethylene glycol into the water bypass tube.

Repeat Winterizing After Water Use

Repeating winterizing steps after any operation or test using water.