LOCATING THE AIR CLEANER
CLEARANCE
It is important to leave enough room to
remove and re-install the inner housing
for lter replacement (see FIGURE 3).
18”
12”
29”
SERVICE
CLEARANCE
90-1347
FIGURE 3: CLEARANCE FOR INNER
HOUSING REMOVAL
INSTALLATION OPTIONS
The Model 5000 can be installed in a
variety of ways. FIGURES 4-7 show some
of the possibilities.
The air cleaner may be installed on the
left or right side of the air handler. If
installed on the right, the ON/OFF switch
will be on top and the nameplate will be
on the bottom. Remove the nameplate
and rotate it 180° to read properly.
APPLICATIONS WITH A
HUMIDIFIER
An Aprilaire Whole-House Humidier
can be mounted upstream from the air
cleaner.
NOTICE
Do not install an atomizing
humidier upstream of the air
cleaner. Water or mist will cause the
power supply to shut down.
AIRFLOW
NOTE:
AIR CLEANER
CAN SUPPORT
UP TO 400 LBS.
90-1158A
90-1161A
FIGURE 4: BOTTOM RETURN IN
UPFLOW “HIGHBOY” INSTALLATION
FIGURE 6: SIDE RETURN IN UPFLOW “HIGHBOY” INSTALLATION
EITHER OF THE METHODS SHOWN WILL RESULT IN A NARROWER “FOOTPRINT”,
CREATING BETTER CLEARANCE IN TIGHT MOUNTING APPLICATIONS.
FIGURE 7: COMPACT SIDE RETURN IN UPFLOW “HIGHBOY” INSTALLATION
AIRFLOW
LEFT SIDE INSTALL SHOWN
90-1159A
FIGURE 5: INLINE IN DUCT, HORIZONTAL
OR VERTICAL INSTALLATION
AIRFLOW
LEFT SIDE INSTALL SHOWN
MINIMIZE
ANGLES
WHERE
AIRFLOW
PLENUM
BOX
AIRFLOW
PLENUM
BOX
SIZE PLENUM
BOX TO FIT
OUTER HOUSING
WITHOUT DOOR:
17-3/4”
x 28-1/8”.
FIGURE 1
90-1160A
90-1163A90-1162A
5