EasyManua.ls Logo

ARIETE 9020 - Page 26

ARIETE 9020
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
suretoenableworktotakeplace.Thisoperationisabsolutelyvitalifbrazingoperationson
thepipe-workaretotakeplace.Ensurethattheoutletforthevacuumpumpisnotcloseto
anyignitionsourcesandthereisventilationavailable.
15. Charging procedures
Inadditiontoconventionalchargingprocedures,thefollowingrequirementsshallbefol-
lowed.
- Ensurethatcontaminationofdi󰀨erentrefrigerantsdoesnotoccurwhenusingcharg-
ingequipment.Hosesorlinesshallbeasshortaspossibletominimisetheamountof
refrigerant contained in them.
- Cylindersshallbekeptupright.
- Ensure that the refrigeration system is earthed prior to charging the system with refrig-
erant.
- Labelthesystemwhenchargingiscomplete(ifnotalready).
- Extremecareshallbetakennottooverlltherefrigerationsystem.
PriortorechargingthesystemitshallbepressuretestedwithOFN.Thesystemshallbe
leaktestedoncompletionofchargingbutpriortocommissioning.Afollowupleaktestshall
becarriedoutpriortoleavingthesite.
16. Decommissioning
Before carrying out this procedure, it is essential that the technician is completely familiar
withtheequipmentandallitsdetail.ltisrecommendedgoodpracticethatallrefrigerants
arerecoveredsafely.Priortothetaskbeingcarriedout,anoilandrefrigerantsampleshall
betakenincaseanalysisisrequiredpriortore-useofreclaimedrefrigerant.ltisessential
thatelectricalpowerisavailablebeforethetaskiscommenced.
a) Becomefamiliarwiththeequipmentanditsoperation.
b) Isolatesystemelectrically.
c) Before attempting the procedure ensure that:
• mechanicalhandlingequipmentisavailable,ifrequired,forhandlingrefrigerantcylin-
ders;
• allpersonalprotectiveequipmentisavailableandbeingusedcorrectly;therecovery
processissupervisedatalltimesbyacompetentperson;recoveryequipmentand
cylinders conform to the appropriate standards.
d) Pumpdownrefrigerantsystem,ifpossible.
e) lfavacuumisnotpossible,makeamanifoldsothatrefrigerantcanberemovedfrom
various parts of the system.
f) Makesurethatcylinderissituatedonthescalesbeforerecoverytakesplace.
g) Start the recovery machine and operate in accordance with manufacturer’s instruc-
tions.
h) Donotoverllcylinders.(Nomorethan80%volumeliquidcharge).
i) Donotexceedthemaximumworkingpressureofthecylinder,eventemporarily.
j) Whenthecylindershavebeenlledcorrectlyandtheprocesscompleted,makesure
thatthecylindersandtheequipmentareremovedfromsitepromptlyandallisolation
valvesontheequipmentareclosedo󰀨.
k) Recoveredrefrigerantshallnotbechargedintoanotherrefrigerationsystemunlessit
hasbeencleanedandchecked.
17. Labelling
Equipment shall be labelled stating that it has been de-commissionedand emptied of
refrigerant.Thelabelshallbedatedandsigned.Ensurethattherearelabelsontheequip-
mentstatingtheequipmentcontainsammablerefrigerant.
26
EN