EasyManua.ls Logo

Ariston E-Combi One LPG - Page 49

Ariston E-Combi One LPG
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
/ 49
MAINTENANCE GUIDE
3.3 Draining
Tools
TIME 5 min
Turn the drain valve anti-clockwise to open and drain the
water from the boiler
1
3.4 Automatic air vent
Tools
TIME 5 min
Drain the boiler (see 3.3).
Unscrew anticlockwise the AAV from the assembly.
1
2
3.5 Primary water pressure sensor
Tools
TIME 5 min
Drain the boiler (see 3.3).
Slide the fi xing clip, (it is held captive) unplug the electrical
connector and lift the sensor from the assembly.
1
2

Table of Contents