2
TABLE OF CONTENTS
1. GENERAL INFORMATION
1.1 GENERAL INSTRUCTIONS
1.2 OVERALL VIEW
2. INSTALLATION
2.1 DELIVERY
2.2 REFERENCE STANDARDS
2.3 SITING THE APPLIANCE
2.4 OVERALL DIMENSIONS
2.5 CLEARANCES
2.6 MOUNTING THE APPLIANCE
2.7 ELECTRICAL CONNECTION
2.8 GAS CONNECTION
2.9 WATER CONNECTIONS
2.10 FLUE CONNECTION
2.11 ROOM THERMOSTAT CONNECTION
2.12 ELECTRICAL DIAGRAMS
2.13 GAS AND WATER CIRCUITS
3. D.H.W. STORAGE CYLINDER
3.1 2 PORT AND 3 PORT VALVE INSTALLATIONS
3.2 DOMESTIC HOT WATER PRIORITY KIT
4. COMMISSIONING
4.1 INITIAL PREPARATION
4.2 CONTROL PANEL
4.3 REMOVING THE FRONT PANEL
4.4 INITIAL START UP
4.5 OPERATIONAL ADJUSTMENTS
4.6 COMBUSTION ANALYSIS
4.7 FUME DISCHARGE MONITORING
4.8 DRAINING THE SYSTEM
5. GAS ADJUSTMENTS
GAS ADJUSTMENT TABLE
5.1 CHANGING THE TYPE OF GAS
6. MAINTENANCE
7. TECHNICAL INFORMATION