EasyManua.ls Logo

ARM MPS3

Default Icon
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.3 Powerup and configuration sequence
The power push buttons and configuration files control the sequence of events of the board powerup and
configuration process.
The following figure shows the powerup and configuration sequence.
3 Configuration
3.3 Powerup and configuration sequence
100765_0000_04_en Copyright © 2017–2020 Arm Limited or its affiliates. All rights
reserved.
3-58
Non-Confidential

Other manuals for ARM MPS3

Related product manuals