EasyManua.ls Logo

Armitage Shanks Avon 21 - Page 7

Armitage Shanks Avon 21
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
6. Orientate the CV housings & inlet adaptors as
shown below.The parts should be assembled in
this sequence.
7. Check valves (CV) & lters (with integral
seals) should be located within the CV-housings
as shown. No need to separate these assem-
blies.
8. Tighten the CV-housings onto the inlet con-
nectors. Ensure the lter is in place as this also
provides the sealing method for this joint. Use
a 19mm A/F spanner on the CV housing & hold
the inlet connector steady with 22mm A/F span-
ner.
9. Fit the exible hoses to the top of the CV-
housings & tighten the exible hose nuts using
19mm A/F spanner. Again hold the inlet con-
nector steady with 22mm A/F spanner.A seal is
captivated within the nut of the exible hose .
10. Connect supply pipes (DN15, Ø12.7mm) to
the inlet connectors. Alternatively, exible hoses
(not supplied) can be used which have G1/2”
female end connections.
Ensure LEFT inlet exible hose
is connected to the HOT water
supply & conversely the RIGHT
inlet to the COLD.
SEE SECTION.6 FOR GUIDE-
LINES ON INSTALLING FLEX-
IBLE HOSES
Excessive force is not necessary
to achieve a good seal between
these parts.
RESTORE SUPPLIES & CHECK ALL JOINTS FOR LEAKS
6
9
7
8
10
19
19
22
Flexible
hose
Check
valve (CV)
CV hous-
ing
Filter
(strainer)
with inte-
gral seal
Inlet
connector
Fit supply pipe
to G1/2” side

Other manuals for Armitage Shanks Avon 21

Related product manuals