EasyManua.ls Logo

Armstrong Air BCS2 Series - User Manual

Default Icon
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
659373-10
May, 2007
RBCS2/BCS2 Series Air Handler
Installation Instructions
Table of Contents
AIR HANDLER SAFETY 1
INSTALLATION REQUIREMENTS 2
Tools and Parts 2
Outdoor System Requirements 2
Location Requirements 2
Installation Configurations 3
Drain Pan Connections 4
Electrical Requirements
5
Ductwork Requirements 6
INSTALLATION INSTRUCTIONS
6
Inspect Shipment
6
Install Condensate Drain 7
Install Ductwork 7
Verify Orifice Size 8
Connect Refrigerant Lines 8
Make Electrical Connections
Models Without Factory Installed Electric Heat 8
Make Electrical Connections –
Models With Factory Installed Electric Heat 9
Wiring Diagram 11
Complete Installation 12
Blower Performance 13
SEQUENCE OF OPERATION 13
AIR HANDLER MAINTENANCE 14
ASSISTANCE OR SERVICE 14
Accessories
14
WARRANTY 14
AIR HANDLER SAFETY
Your safety and the safety of others are very important.
We have provided many important safety messages in this manual and on your appliance. Always read and obey all safety
messages.
This is the safety alert symbol.
This symbol alerts you to potential hazards that can kill or hurt you and
others.
All safety messages will follow the safety alert symbol and
either the word “DANGER” or “WARNING.” These words mean:
You can be killed
or seriously injured if
you don’t immediately follow
instructions.
You can be killed or seriously injured if
you don’t follow instructions.
All safety messages will tell you what the potential hazard is, tell you how to reduce the chance of injury, and tell you what
can happen if the instructions are not followed.
Question and Answer IconNeed help?

Do you have a question about the Armstrong Air BCS2 Series and is the answer not in the manual?

Summary

AIR HANDLER SAFETY

INSTALLATION REQUIREMENTS

INSTALLATION INSTRUCTIONS

Install Condensate Drain

Detailed steps for connecting and testing the condensate drainage system.

Connect Refrigerant Lines

Make Electrical Connections - Models Without Factory-Installed Electric Heat

Make Electrical Connections - Models With Factory-Installed Electric Heat

208-Volt Conversion

Wiring Diagram - Electric Heat and Blower

Complete Installation

PRE-Start Check

A checklist of essential items to verify before starting the unit.

Check Blower Operation

How to verify the indoor blower motor is functioning correctly.

Check Electric Heater (if used)

Steps to test the auxiliary electric heating element's operation.

SEQUENCE OF OPERATION

AIR HANDLER MAINTENANCE

Armstrong Air BCS2 Series Specifications

General IconGeneral
Product TypeAir Handler
SeriesBCS2
Cooling CapacityUp to 5 tons
Cabinet ConstructionGalvanized Steel
Voltage208/230V
AirflowUp to 2000 CFM
Motor TypeECM
Filter TypeStandard
ConfigurationUpflow, Downflow, Horizontal
StagesSingle or Multi-Stage

Related product manuals