ASBER – BAR EQUIPMENT: Operations and Service Manual/ Rev. JUN. 2015
PAGE 2
CONTENTS
1 RECEIVING AND INSPECTING THE EQUIPMENT _____________________________ 3
2 SPECIFICATIONS ______________________________________________________ 4
3 DIMENSION _________________________________________________________ 5
4 INSTALLATION _______________________________________________________ 7
4.1 UNCRATING ___________________________________________________ 7
4.2 SEALING ______________________________________________________ 7
4.3 TAPPING INSTRUCTIONS _________________________________________ 8
4.4 LOCATION ____________________________________________________ 10
4.5 DATA PLATE __________________________________________________ 10
4.6 ELECTRICAL CONNECTIONS ______________________________________ 11
4.7 SHELVING INSTALLATION ________________________________________ 11
5 OPERATION ________________________________________________________ 12
5.1 ANALOG THERMOSTAT__________________________________________ 12
6 MAINTENANCE _____________________________________________________ 13
6.1 CLEANING THE CONDENSER COIL _________________________________ 13
6.2 GASKET ______________________________________________________ 14
6.3 DOORS/HINGES _______________________________________________ 14
6.4 DRAIN _______________________________________________________ 14
6.5 PROCEDURE TO INSTALL THE AIR CHANNELS AND DRAFT
TOWERS (ONLY “DD” MODELS) _____________________________________ 15
7 WIRING DIAGRAMS __________________________________________________ 16
8 TROUBLE SHOOTING _________________________________________________ 18
LIMITED WARRANTY ______________________________________________________ 19