30
NB! The machine’s maximum
working pressure can be adjusted
using the OPV
10
next to the coffee
group
8
. To do this, use the blind
filter fitted in the filter holder
7
, attach
it to the group
8
and turn on the
coffee switch
1
. The pressure can be
adjusted by turning the OPV
10
using a
flat-head screwdriver. Turning it to the
right increases the maximum working
pressure and turning it to the left
reduces it.
WARNING: To avoid the risk of injury,
do not open the brew chamber during
the brew process.
PID models
Programming the coffee dose
PID models have a coffee dose
control function, so that the amount
of coffee required can to be adjusted
for both the available options (small
coffee, large coffee).
There is a 3-position
1
coffee switch
for this purpose. The two available
coffee selections are obtained by
turning the switch to the top or bottom
positions, while the midpoint turns off
the coffee function.
NB! The coffee switch
1
on the two
PID models is not a permanent setting.
Once the function has been activated, it
returns to its original position. The switch
does not have to stay in the working
position; once the programmed amount
of coffee has been obtained, the function
will stop automatically.
To programme the dose at either
of the two selections, just turn the
switch to the desired position until
the required amount is obtained. On
releasing it, the dose will have been
programmed.
4.
Making cappuccino
True ‘cappuccino’ contains 25
millilitres of espresso coffee and
125 millilitres of cold steam-
whipped milk, which goes from 3
or 4 degrees centigrade to nearly
55 degrees centigrade. Use fresh
cow’s milk with a protein content of
over 3.2 percent and a fat content
of 3.5 percent. Whip only the amount
required for one cup in a steel jug
to prevent it from mixing with other
odours or tastes.
The density of the cream must
be uniform and there must be no
separation from the liquid, or holes
or bubbles.
Proceed as follows:
5. Turn on the general switch
2
. The
pilot lights come on
6
and pilot
light
13
flashes. The PID system
screen
21
shows the temperature
rise in PID models.
6. When the pilot light
13
comes
on and stops flashing and the
screen
21
shows the pre-set
coffee temperature, turn on the
steam switch (3-II). The pilot light
12
will flash, indicating the heating
process to steam temperature.
The screen
21
will flash the pre-set
steam temperature in PID models.
7. Turn on the hot water/steam
knob
4
and let water flow until
it is running discontinuously.
Turn it off. Wait for the pilot light
to
12
come on without flashing.
This shows that the water has
reached the right temperature.
The temperature value will also be
shown steadily on the screen
21
.
The pump will start to work in
bursts. When this happens, turn
the knob again to get steam
4
.
ENGLISH
MAN.29 V8 - MANUAL DREAM PID-ONE 2022.indd 30MAN.29 V8 - MANUAL DREAM PID-ONE 2022.indd 30 02/06/2022 8:53:5802/06/2022 8:53:58