EasyManua.ls Logo

Ashcroft 2074 - Installation Procedure (Type 2274 XAOU2); Wiring Switch 1; Wiring Switch 2

Ashcroft 2074
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
Installation Procedure for 2274 XAOU2:
ESD precautions should be taken. See page 31 for details.
1. Ensure all power is off/disconnected from the circuit.
2. Connect the white wire (T) to the positive power terminal.
3. Connect the green wire (S) to the negative power terminal.
4. Connect the red wire (Q) to the positive power terminal.
5. Connect the black wire (R) to the positive meter terminal.
6. Connect the negative power terminal with the negative
meter terminal.
Note: Meter should be installed on the black wire only.
Wiring Switch 1:
Normally Open: Use the blue and brown wires.
Normally Closed: Use the orange and brown wires.
Wiring Switch 2:
Normally Open: Use the yellow and grey wires.
Normally Closed: Use the violet and grey wires.
If red/black wired are connected prior to green/white wires
and power is connected, output may be damaged due to
overloading.
I&M008-10109-DIG Rev F 07-12_layout 10/14/13 9:45 AM Page 29

Related product manuals