Vertical Shaft Impactor
46
OK
Adjust
Preoperation Checklist
The preoperational check should be performed
any time the equipment is moved to a new site, or
if it has been in storage for an extended period.
Check each component to insure that it is in
operational condition. This check should include,
but not be limited to the following items.
AdjustOK
PREOPERATIONALCHECKS
1. Sheet Metal/Appearance/Paint
2. Circulating Oil System
a. All ttings greased
b. Oil reservoir level (1” below top of
site glass)
c. Oil lters
d. Hoses and ttings
e. Oil breathers clean and free of
blockage
3. V-belts tight
4. Grease lube points
5. Inspection doors closed
6. Lid hold-down wedges installed in lid
7. All liners in place and secure.
8. General
a. Operator’s manual on unit
b. Decals in place and readable
c. Safety guards in place

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ASTEC KPI-JCI and is the answer not in the manual?

ASTEC KPI-JCI Specifications

General IconGeneral
BrandASTEC
ModelKPI-JCI
CategoryConstruction Equipment
LanguageEnglish

Related product manuals