10
Machine Operation
Pre-Start Checklist
Before operating a Rubber Track
Loader, inspect the machine. Look for
any loose or worn parts. This inspection
will help avoid machine damage or per-
sonal injury during operation.
Check for proper:
1. Track tension;
2. Fluid levels;
3. Fan belt tension and condition;
4. Hoses (no visible signs of wear);
5. Fittings (no leaks);
6. Battery cables;
7. Controls for neutral.
Starting Procedure
Before starting the engine, perform the
pre-start checklist then proceed with the
following procedure:
1. Enter machine with lift arms all the
way down. Maintain a three-point
contact with the machine (photo A).
2. Fasten seat belt, and lower lap bar
into position.
3. Starting with the throttle in the
SLOW position, push the throttle 1/3
the way open.
4. Turn the ignition key to the left for 6
seconds to “pre-heat” the engine.
While pre-heating, the glow plug
operation light will illuminate.
5. Turn the ignition key to the right to
start the engine.
6. Run the engine at low idle for 3 to 5
minutes to warm up the engine.
7. Set throttle to desired rpm.
NOTE: The parking brake is automatically
engaged when the engine is turned off, the
operator is not in the seat or the lap bar is
raised.
A
B
!WARNING! Entering or exiting the vehi-
cle under raised lift arms could cause
serious injury or death. Never allow
anyone to be underneath raised, unse-
cured lift arms (photo B).