EasyManuals Logo

Atag i Series Technical Guide

Atag i Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #59 background imageLoading...
Page #59 background image
5
6
7
4
5
6
7
Disconnect the electrical connections from the fan (5)
Turn the left (6) and right (7) clamp bars a quarter turn with a 4mm
Allen key and pull these out in a forward motion. Mind the direction of rotation (red control cams);
Now lift the complete fan unit (5) with the upper tray of the heat exchanger and remove it in a forward-motion
Turn the unit upside down and remove the burner cassette (8) from the ventilator unit
Check the burner cassette for wear and tear, pollution and any breakages. Clean the burner cassette
with a soft brush and vacuum cleaner
In the case of breakages, always replace the complete burner cassette (8)
The following operations must be performed carefully in relation to the vulnerability of the non return valve.
After removing the burner cassette (8) the non return valve (12) becomes visible. Check that the non return valve
entire circumference closes / seals completely. The valve should be able to move freely from fully open to fully
closed. Replace the non return valve if the valve does not seal properly.
Replace the gasket (9) between the burner (8) and upper casing (10)
Replace the gasket (11) between the upper casing (10) and exchanger
!
11 12
8
9
10
59

Other manuals for Atag i Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag i Series and is the answer not in the manual?

Atag i Series Specifications

General IconGeneral
BrandAtag
Modeli Series
CategoryBoiler
LanguageEnglish

Related product manuals