EasyManuals Logo

Atag Q 25S Operating Instructions

Atag Q 25S
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Check the water pressure regularly and top up the installation when
necessary.
The working pressure of the installation should be between 1.5 and 1.7 bar
Q
11
Operating
instructions
It can take a while before all air has dis-appeared from a filled installation. Especially
in the first week noises can be heard which indicate the presence of air.
The
automatic air vent in the boiler will make this air disappear, which means the
water
pressure will reduce during this period and therefore topping up with water will
be
necessary to adjust the flow water temperature
The boiler will not function directly. The automatic de-aeration programm of
about
17 minutes will start after one of the three programm keys is pressed. The
display
will show where A stand s for Automatic de-aeration programm Active
and
the number on the right indicates the actual water temperature of the boiler.

Other manuals for Atag Q 25S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag Q 25S and is the answer not in the manual?

Atag Q 25S Specifications

General IconGeneral
BrandAtag
ModelQ 25S
CategoryBoiler
LanguageEnglish

Related product manuals