EasyManua.ls Logo

ATEN PE6108AV - Page 47

ATEN PE6108AV
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4. Browser Operation
37
Power On Time Schedule Settings
Check the Enable Power On Time Schedule box to use the Power ON
Delay setting to set the amount of time the eco PDU waits before powering
on an outlet. See Power ON Delay in the table on the next page.
Buzzer Setting
Checking the Enable Buzzer Alarm box sounds an alarm and sends
SNMP trap or e-mail alerts when a threshold setting exceeds the minimum
or maximum setting.
Outlet Reboot Setting
Checking the Enable Outlet Sequential Reboot box allows you to
sequentially reboot all outlets by pressing the Power Control Button of
Outlet 1 for more than 8 seconds.
Bank POP Priority List
Use the eight drop-down menus to set the priority for when Proactive
Overload Protection powers off the outlets. The outlet set as Priority1 will
be powered off first, Priority2 will be powered off second, and so on.
Outlets set to N/A will not be powered off when Proactive Overload
Protection is triggered.
To change the Priority List, set at least two drop-down menus to N/A.
Outlets set to N/A become available for selection in the Priority drop-
down menus. An easy way to reconfigure all outlets is to set all drop-down
menus to N/A and then go back select an outlet for each Priority1~8
setting. Outlets set to N/A will not be powered off when Proactive
Overload Protection is triggered.

Table of Contents

Related product manuals