EasyManua.ls Logo

Atlas Copco PHE 24 Series User Manual

Atlas Copco PHE 24 Series
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Question and Answer IconNeed help?

Do you have a question about the Atlas Copco PHE 24 Series and is the answer not in the manual?

Atlas Copco PHE 24 Series Specifications

General IconGeneral
BrandAtlas Copco
ModelPHE 24 Series
CategoryOther
LanguageEnglish

Summary

Dismantling the SDS-Plus-Reception

SDS-Plus Reception Dismantling Steps

Detailed steps for dismantling the SDS-Plus reception.

Dismantling the FIXTEC-reception

FIXTEC Reception Dismantling Steps

Detailed steps for dismantling the FIXTEC reception.

Component Removal

Removing the Gear Housing

Steps to remove the gear housing, including model-specific notes.

Removing the Spindle

Procedure for the safe removal of the spindle assembly.

Removing the Striker

Method for detaching the striker from the tool.

Spindle Dismantling Variations

Inner Locking Ring Removal (Up to 12/95)

Procedure for removing the inner locking ring for older models.

Inner Locking Ring Removal (From 09/96)

Procedure for removing the inner locking ring for newer models.

Spindle and Gear Shaft Dismantling

Spindle Inner Parts Removal

Steps to dismantle inner parts of the spindle.

Back Gear Shaft and Cylinder Removal

Procedure for removing the back gear shaft and cylinder.

Back Gear Shaft Dismantling

Steps for dismantling the back gear shaft.

Handle and Electrical Parts Removal

Dismantling the Handle

Steps for dismantling the tool's handle assembly.

Dismounting Electrical Parts

Procedure for removing electrical components.

Removing the Armature

Steps to remove the armature from the motor housing.

Field Removal and Maintenance

Removing the Field

Procedure for removing the field from the motor housing.

Maintenance - General

Recommendations for regular tool maintenance and part exchange.

Maintenance - Torque Specifications

Torque values for key assembly screws.

Lubrication and Post-Dismantling Checks

Lubrication Chart

Detailed lubrication chart with part names, grease types, and quantities.

Cleaning Procedures

Guidelines for cleaning parts, with specific attention to bearings.

Abrasion Test

Instructions for checking parts for abrasion and necessary exchange.

Electrical Test

Requirement for an electrical test before reassembly.

Assembly Procedures - Initial Steps

Mounting the Field

Steps for mounting the field into the motor housing.

Mounting the Armature

Procedure for inserting and securing the armature.

Assembling Electrical Parts

Steps for installing carbon brushes, covers, and connecting wires.

Assembly Procedures - Handle and Gear Shaft

Assembling the Handle

Steps for reassembling the tool's handle and covers.

Assembling the Back Gear Shaft

Procedure for assembling parts onto the back gear shaft.

Assembly Procedures - Spindle and Gear Shaft Integration

Mounting Back Gear Shaft and Cylinder

Steps for integrating the back gear shaft and cylinder.

Assembling Spindle (Inner Parts)

Procedure for assembling inner parts of the spindle.

Assembly Procedures - Spindle and Housing

Assembling Spindle (Outer Parts)

Steps for assembling the outer parts of the spindle.

Mounting the Spindle

Procedure for fitting the spindle and gear components.

Mounting the Gear Housing

Steps for attaching the gear housing to the end shield.

Final Assembly and Testing

Mounting the SDS-plus Reception

Steps for reassembling the SDS-plus reception.

Mounting the FIXTEC-reception

Steps for reassembling the FIXTEC reception.

Test Run and Electrical Examination

Final procedures for testing the tool after assembly.

Related product manuals