EasyManua.ls Logo

Atlas Copco XATS 250 PE Stage V APP

Atlas Copco XATS 250 PE Stage V APP
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 53 -
MAINTENANCE SCHEDULE ENGINE AND COMPRESSOR
Maintenance schedule (running hrs) Notes Daily 50 hrs after
initial start-up
Every 250
hrs
Every 500
hrs
Every
1000 hrs
Yearly 2 Yearly
Drain water from fuel filter X
Drain/Clean fuel tank water and sediments (1) X
Drain condensate and water from spillage-free
frame or catch basin
X
Empty air filter vacuator valves X
Check engine oil level (if necessary top up) X
Check compressor oil level (if necessary top up) X
Check coolant level X
Check/Fill fuel level (3) X
Check air intake vacuum indicators X
Check for leaks in engine, compressor, air, oil, or
fuel system
X X
Check functioning of regulating valve X
Check control panel X
Check on abnormal noise X
Check electrical system cables for wear X X X
Check torque on critical bolt connections X X
Check electrolyte level and terminals of battery X X X
Check engine (minimum and maximum) speed X X
Replace compressor oil filter(s) (5) X X
Inspect/Adjust fan belt X X X
Replace fan belt X X
Hoses and clamps - Inspect/Replace X X X
Change engine oil (2) X X X
Replace engine oil filter (2) X X X
Replace fuel (pre)filters (6) X X

Table of Contents

Related product manuals