ATS Systems Ultimate Chuck Installation and Operation Manual
TABLE OF CONTENTS
PRECAUTIONS
Summary of safety instructions
Safety warning label
Safety precautions 1.1 – 1.3
SPECIFICATIONS
Specification data sheets and drawings 2.1
INSTALLATION
Installation procedure 3.1 Checking jaw stroke 3.2
OPERATION
Basic operating points 4.1
Positioning base jaws in chuck 4.2
Use of half-pitch base jaws 4.3 Bolting top jaws to base jaws 4.4
Estimating safe chuck speed (RPM) 4.6
MAINTENANCE
Disassembly and assembly of chuck 5.1
Lubrication 5.2 Spare Parts 5.3
OTHER INFORMATION
Spare parts identification drawing and chart 6.1 Summary document for
Operator training 6.2 ATS Systems Product Warranty 6.3