EasyManua.ls Logo

avolta A007E-10C - Operation Introduction; Before Starting Operations

avolta A007E-10C
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Notes:
- Do not drop the remote control.
- Do not place the remote control in a location exposed to direct sunlight.
6. Operation Introduction
Before starting operations in this section:
1) Find a place where there is power supply nearby.
2) As shown in Fig.2 and Fig.2a, install the exhaust hose, and adjust the window position well.
Fig.2 Fig.2a
3) As shown in Fig. 6, connect drain hose well (only for using heating model)
4) Insert the power cord into an grounded AC220~240V/50Hz socket;
5) Press the POWER button to turn on the air-conditioner.
1.Before using
Notice:
- Operation temperature range:
Maximum cooling
Minimum cooling
DB/WB(
)
35/24
18/12
6. Operation Introduction

Related product manuals