EasyManua.ls Logo

Bajaj pulsar DTS-i - Page 128

Bajaj pulsar DTS-i
253 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DISMANTLING ENGINE SUB ASSEMBLIES
B
C
A
Oil Pump :
Remove :
Clip
Oil strainer element with 'O' ring
(A)
(B)
(C)
Bearing Removal from Assly Balancer Idler Gear Cover and Crankcase
RH
Using Sp. Tool : Bearing Extractor - 37 10CD 30
Remove :
Needle roller bearing from RH crankcase.
Assembly Balancer Idler Gear
Remove :
(A)
(B)
(C)
(D)
Thrust washers
Circlip from any one side of the gear
Scissor gear
Torsion Spring
Similarly carry out the same procedure on other side of the gear to
dismantle the idler gear completely.
AC
BD
E
CB A
D
Gear Complete Starter Counter Assembly
Remove :
Place the gear comp. starter counter assly on the arbor press as
shown in the figure.
Using Bearing driver set (P. No. 37 1030 61)
Needle roller bearing.
BC
D
EF
G
H
J
IK
A
Input Shaft Assembly
1st gear is integral with the shaft
Remove thrust washer and slide out gear 2nd drive
Remove gear 5th drive and collect the splined washer
behind it.
Remove circlip and remove gear 3rd drive
Remove circlip and collect the splined washer
Remove gear 4th and collect the thrust washer behind it.
(A)
(B) (C)
(D) (E)
(F) (G)
(H) (I)
(J) (K)
Pulsar 150/180 DTS-i
Service Station Manual
124
Dealer Development Center
Akurdi Pune

Related product manuals