EasyManua.ls Logo

Bakon DROP TT - Starting Production; Initial Setup and Operation

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
SECTION 6: Starting production
1. Turn on machine and press the touch screen
2. Place a tray under the nozzle to collect batter while filling the pump
3. Fill the hopper
4. Reset (once hopper lid is properly closed)
5. Fill the pump manually (see section 2)
6. Remove collecting tray once all the nozzles are full
7. Press start
8. Place a tray on the belt and the machine will start depositing
9. Place the next tray if you want to continue depositing, make sure you leave 2
inches distance between trays.