EasyManua.ls Logo

Baldor TS45 - Page 18

Baldor TS45
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
OPERATION STARTING
1. Conduct Prestart Procedures.
2. Switch the generator set to the applicable voltage setting.
3. Connect the load(s) to the circuit breaker.
WARNING: High voltage is present when the generator set is running.
4. Move the Master Control Switch to the appropriate position.
5. Adjust the voltage if necessary by turning the voltage adjustment knob located on the control panel.

Table of Contents

Other manuals for Baldor TS45

Related product manuals